Stage 01
Early site preparation with access routes, leveled operating areas and the first modular utility and solar infrastructure in place.
Explore the Full Capacity site as an interactive masterplan — from greenhouse cultivation and biological processing to laboratory, visitor and logistics infrastructure.
Select a mapped zone to explore its function, confirmed area and role within Full Capacity’s Cyprus production and demonstration hub.
The confirmed Cyprus program combines headquarters, visitor areas, greenhouses, vermicompost production, biochar, recycling, storage, precomposting and large-scale terraced cultivation in one operating hub.
Terraces Planting Program
1,500 fig trees · 20,000 rosemary plants · 10,000 lavender plants across the 18,000 m² terraces area.
A six-stage visual record of how the Cyprus hub was built — from initial ground preparation and utility setup to greenhouse construction, production buildings, terraced planting infrastructure and the operating facility visible today.
To protect the operating site, systems and visiting partners, facility access is confirmed only after visitor details and a passport ID copy are manually reviewed by the Full Capacity team.
See Hydra installations, greenhouse applications, vermicompost production, processing, modular systems and the showroom in one operating location.